SCIAMACHY Detailed Mission Operation Plan - SDMOP (mission extension phase since 2008)
The SDMOP exists both as a SOST simulation (early availability at OSDF generation, reduced accuracy of 1-2 sec, no CTI upload entries) and as a SOST generated derivative of the ENVISAT UDMOP/DMOP. Whenever a DMOP replaces the associated UDMOP, the link to the UDMOP is deleted here.
The SDMOP derived from the ENVISAT DMOP usually contains a wider orbit range than the SIM_SDMOP as the ENVISAT DMOP lists MPS driven operations of all instruments, i.e. also those orbits with no SCIAMACHY activities. Therefore, the start/stop orbit information provided below is limited to SCIAMACHY relevant orbits only.
Select year: 2012 / 2011 / 2010 / 2009 / 2008